Swimming
Pool for Alston, Cumbria
Brief
The
community of Alston Moor interviewed a number of consultants
before selecting Gaia for their combined experience in Community
Sports projects and Ecological Design. The brief given to Gaia
is to develop a credible business plan for the project which
demonstrates that it can be sustained into the future.
Prospectus
The
project is currently in the midst of its prospectus stage. A
very large number of local people turned out to the first concept
planning meeting and came up with a number of ideas. The most
powerful of these was to build a wind farm in order to be able
to supply all the energy needs of the project. This would enable
Alston Moor Project for Leisure and the Environment (AMPLE)
to become the UK's first financially viable swimming pool.
This project sits in an area which has been very seriously affected
by the 2001 Foot and Mouth epidemic, and diversification of
rural activity is essential for the future survival of this
remote rural area.

|